INSTALLATION OF PU HAD TO BE PUT ON HOLD
Installation of PU had to be put on hold due to a very wet substrateFor the proper installation of P
Read more >
Painting after drying
The plastering phase of your project is almost completed. Now is the time for efficient drying of the plasterwork. One address: Buildingdryers.be!
Read more >
Laying parquet
Your building project is finally coming to an end. Are you planning to install parquet flooring? Then make sure that the screed has fully dried out.
Read more >
Practical tips
With natural drying it is difficult to estimate the length of the drying process, but also with building dryers it is virtually impossible to determine the exact drying time. In general.
Read more >
Hiring measuring equipment
Also when using building dryers, it not always excactly clear how long the drying process will take. To know just how dry your wall or screed already is, you can use specialised measuring equipment.
Read more >
A building dryer: operation?
Too much moisture can cause a lot problems in your home. These may result not only from leakage or water damage; a large amount of moisture also builds up in your home during the actual construction.
Read more >