

-1691658667.jpg)
Dendermonde
The architectural firm Quisquater called on our expertise for the drying of the offices and apartments in this new construction project. The building could not be heated yet and within a month, parquet flooring, doors and furniture had to be installed here. According to the architect, the temperature in the building definitely needed to get up to 20° C and plaster and screed could be dried more quickly.
By using a few DF400 in combination with the powerful TTV4500 fans and electric heaters of the DFE25 type, we were able to provide clean, dry and odourless warm air. We wish Architectenbureau Quisquater good luck and job satisfaction at their new site. And for anyone who might still be looking for a handsome new-build apartment that’s been finished to perfection…. www.immotijl.be
Laying parquet
Your building project is finally coming to an end. Are you planning to install parquet flooring? Then make sure that the screed has fully dried out.
Read more >
Building dryer: fire damage
Using a building dryer is recommended in the event of damage caused by extinguishing water. Not only will the fire itself have caused significant damage to your home.
Read more >
Building dryer and fan
Hiring a building dryer is interesting for those who want to finish their home. It will save you time and also the stress that is associated with lack of time.
Read more >
Practical tips
With natural drying it is difficult to estimate the length of the drying process, but also with building dryers it is virtually impossible to determine the exact drying time. In general.
Read more >
Building dryer: water damage
Using a building dryer is essential when your home has fallen prey to water damage. If you fail to do so, the consequences can be serious.
Read more >
Stockroom
Provincialeweg 1
2890 Puurs-Sint-Amands
(Enter in Google Maps)
REGISTERED OFFICE
Houtenmolenstraat 69B
B-9255 Buggenhout
BTW BE0886.987.301
KBC BE57 7370 2003 9435
0476/20.41.56
info@bouwdroger.com