Gent
It was looking uncertain that the deadline for finishing this residential care centre would be met. On one hand, the plastering and screed were still too wet, and also, the inside temperature needed to be at least 15C° for the PVC flooring to be laid.
The request for the quote came in on Monday afternoon. We visited the worksite an hour later, and everything was installed the following day. Since there wasn't enough power available at the worksite to heat it electrically, they chose the solution of an indirect fired heater Master BV690FS (220Kw) and a 1200L fuel oil tank. For the drying, eight DF800 industrial dehumidifiers were provided in combination with eight powerful TTV4500 fans.
How many buildingdryers?
When you have decided to use building dryers to speed up the drying time of your screed or plasterwork, you should ask yourself how many building dryers you will need to ensure optimal drying.
Read more >
Interior designers
At long last, the time has come to furnish your interior. You draw inspiration from the many available options and carefully look for the right materials to furnish your home.
Read more >
Nebulizer
Good to know: Since 1 January 2017, contractors have been required to keep dust emissions as low as possible when carrying out construction works. Fortunately, Buildingdryers.be has the solution.
Read more >
Industrial dust extraction
One of the most important ways to quickly and efficiently neutralise construction and refurbishing dust and dirt is good Industrial dust extraction. The Trotec TAC series is your lifesaver!
Read more >
Dust extraction
Construction or renovation and dust go hand in hand. But that does not mean that you or the people on your worksite have to breathe in dust the whole time.
Read more >
Stockroom
Provincialeweg 1
2890 Puurs-Sint-Amands
(Enter in Google Maps)
REGISTERED OFFICE
Houtenmolenstraat 69B
B-9255 Buggenhout
BTW BE0886.987.301
KBC BE57 7370 2003 9435
0476/20.41.56
info@bouwdroger.com