In this stunning villa in Marke, a part of the ceiling had collapsed. The concrete ceiling surface was still too wet at the time for plastering. The result was the mess you can see in the photos.
Ordinarily, people only call upon our company’s services after the floor slab and plastering have been finished.
However, if there is a lot of moisture in the structure of your building, then it's a good idea to install an industrial dehumidifier two weeks before you want to do the plastering. The plaster will adhere better and you can avoid situations like this one. It's certainly a way to save yourself a lot of stress, time and money.
Building dryer: low temperatures
It is a myth that building dryers work less efficiently at lower temperatures. What is true is that building dryers thrive, and therefore perform optimally, in warmer environments.
Read more >
Types of building dryers
In principle, there are two types of dryers on the market: condensation dryers and adsorption dryers. For drying out buildings we always use condensation dryers.
Read more >
Practical tips
With natural drying it is difficult to estimate the length of the drying process, but also with building dryers it is virtually impossible to determine the exact drying time. In general.
Read more >
Industrial dust extraction
One of the most important ways to quickly and efficiently neutralise construction and refurbishing dust and dirt is good Industrial dust extraction. The Trotec TAC series is your lifesaver!
Read more >
Building dryer and fan
Hiring a building dryer is interesting for those who want to finish their home. It will save you time and also the stress that is associated with lack of time.
Read more >
Stockroom
Provincialebaan 152
9255 Buggenhout
REGISTERED OFFICE
Provincialebaan 152
9255 Buggenhout
BTW BE0886.987.301
KBC BE57 7370 2003 9435
0476/20.41.56
info@bouwdroger.com