In this stunning villa in Marke, a part of the ceiling had collapsed. The concrete ceiling surface was still too wet at the time for plastering. The result was the mess you can see in the photos.
Ordinarily, people only call upon our company’s services after the floor slab and plastering have been finished.
However, if there is a lot of moisture in the structure of your building, then it's a good idea to install an industrial dehumidifier two weeks before you want to do the plastering. The plaster will adhere better and you can avoid situations like this one. It's certainly a way to save yourself a lot of stress, time and money.
.jpg)
Nebulizer
Good to know: Since 1 January 2017, contractors have been required to keep dust emissions as low as possible when carrying out construction works. Fortunately, Buildingdryers.be has the solution.
Read more >
.jpg)
Building dryer: fire damage
Using a building dryer is recommended in the event of damage caused by extinguishing water. Not only will the fire itself have caused significant damage to your home.
Read more >
.jpg)
Laying parquet
Your building project is finally coming to an end. Are you planning to install parquet flooring? Then make sure that the screed has fully dried out.
Read more >
.jpg)
Dust extraction
Construction or renovation and dust go hand in hand. But that does not mean that you or the people on your worksite have to breathe in dust the whole time.
Read more >

Practical tips
With natural drying it is difficult to estimate the length of the drying process, but also with building dryers it is virtually impossible to determine the exact drying time. In general.
Read more >
Stockroom
Provincialeweg 1
2890 Puurs-Sint-Amands
(Enter in Google Maps)
REGISTERED OFFICE
Houtenmolenstraat 69B
B-9255 Buggenhout
BTW BE0886.987.301
KBC BE57 7370 2003 9435
0476/20.41.56
info@bouwdroger.com