In this stunning villa in Marke, a part of the ceiling had collapsed. The concrete ceiling surface was still too wet at the time for plastering. The result was the mess you can see in the photos.
Ordinarily, people only call upon our company’s services after the floor slab and plastering have been finished.
However, if there is a lot of moisture in the structure of your building, then it's a good idea to install an industrial dehumidifier two weeks before you want to do the plastering. The plaster will adhere better and you can avoid situations like this one. It's certainly a way to save yourself a lot of stress, time and money.
Types of building dryers
In principle, there are two types of dryers on the market: condensation dryers and adsorption dryers. For drying out buildings we always use condensation dryers.
Read more >
A building dryer: operation?
Too much moisture can cause a lot problems in your home. These may result not only from leakage or water damage; a large amount of moisture also builds up in your home during the actual construction.
Read more >
How many buildingdryers?
When you have decided to use building dryers to speed up the drying time of your screed or plasterwork, you should ask yourself how many building dryers you will need to ensure optimal drying.
Read more >
Dust extraction
Construction or renovation and dust go hand in hand. But that does not mean that you or the people on your worksite have to breathe in dust the whole time.
Read more >
Interior designers
At long last, the time has come to furnish your interior. You draw inspiration from the many available options and carefully look for the right materials to furnish your home.
Read more >
Stockroom
Provincialebaan 152
9255 Buggenhout
REGISTERED OFFICE
Provincialebaan 152
9255 Buggenhout
BTW BE0886.987.301
KBC BE57 7370 2003 9435
0476/20.41.56
info@bouwdroger.com