NEW RED CROSS BLOOD BANK
Plaats

Vanden Avenne in Buggenhout

Type uitgevoerde werken

The Red Cross had this new storage facility built in order to store blood. The floor here still needed to be given a seamless coating with an epoxy floor = a seamless poured floor. Since the concrete here was still too wet, 3 DF800 industrial dehumidifiers were installed together with 6 TTV4500 fans. The concrete floor was completely dry in 14 days and they were able to continue with the finishing work. We would like to express our thanks again to the Red Cross, because after all, they provide a continuous supply of safe blood products to most of our hospitals in Flanders.

NAAR OVERZICHT
Discover our tips

Practical tips
With natural drying it is difficult to estimate the length of the drying process, but also with building dryers it is virtually impossible to determine the exact drying time. In general.
Read more >

Discover all our tips
Discover our tips

Dust extraction
Construction or renovation and dust go hand in hand. But that does not mean that you or the people on your worksite have to breathe in dust the whole time.
Read more >

Discover all our tips
Discover our tips

Nebulizer
Good to know: Since 1 January 2017, contractors have been required to keep dust emissions as low as possible when carrying out construction works. Fortunately, Buildingdryers.be has the solution.
Read more >

Discover all our tips
Discover our tips

Odour control
Are you suffering from air pollution in your home or business? Ozone generators allow odour components and other air pollutants to be efficiently decomposed at molecular level.
Read more >

Discover all our tips
Discover our tips

Odour eliminators
Does your home have an unpleasant odour? Or do you need an air purifier at your place of business?
Read more >

Discover all our tips