

Vanden Avenne in Buggenhout
The Red Cross had this new storage facility built in order to store blood. The floor here still needed to be given a seamless coating with an epoxy floor = a seamless poured floor. Since the concrete here was still too wet, 3 DF800 industrial dehumidifiers were installed together with 6 TTV4500 fans. The concrete floor was completely dry in 14 days and they were able to continue with the finishing work. We would like to express our thanks again to the Red Cross, because after all, they provide a continuous supply of safe blood products to most of our hospitals in Flanders.
.jpg)
Odour eliminators
Does your home have an unpleasant odour? Or do you need an air purifier at your place of business?
Read more >
.jpg)
A building dryer: operation?
Too much moisture can cause a lot problems in your home. These may result not only from leakage or water damage; a large amount of moisture also builds up in your home during the actual construction.
Read more >
.jpg)
Industrial dust extraction
One of the most important ways to quickly and efficiently neutralise construction and refurbishing dust and dirt is good Industrial dust extraction. The Trotec TAC series is your lifesaver!
Read more >
.jpg)
Dust extraction
Construction or renovation and dust go hand in hand. But that does not mean that you or the people on your worksite have to breathe in dust the whole time.
Read more >

Building dryer: low temperatures
It is a myth that building dryers work less efficiently at lower temperatures. What is true is that building dryers thrive, and therefore perform optimally, in warmer environments.
Read more >
Stockroom
Provincialeweg 1
2890 Puurs-Sint-Amands
(Enter in Google Maps)
REGISTERED OFFICE
Houtenmolenstraat 69B
B-9255 Buggenhout
BTW BE0886.987.301
KBC BE57 7370 2003 9435
0476/20.41.56
info@bouwdroger.com