When your home or building really needs to be dry
Discover our drying solutions

DRYING PLASTERWORK

A beautiful new build home that is covered with mould shortly after plastering, is not a pretty sight. The use of building dryers brings down the overall humidity so that moulds do not stand a chance. Would you like to know how long it takes to dry your walls and why drying plasterwork with building dryers is a good choice?

Drying plasterwork with building dryers.

Drying plasterwork: how long does it take?

Drying plasterwork with building dryers can be done already 24 hours after installation. To let the plasterwork dry properly, it is best to work with building dryersfans and, where necessary, additional heating. At Building Dryer you do not need to wait long before your walls are dry. When using the right building dryers, the stucco dries at a rate of 1 cm per week. The stucco is normally 2 cm thick, so that the plasterwork takes about two weeks to dry

Note, however, that any rain during the construction may result in the concrete blocks being still saturated with moisture. In that case, the drying time of the plasterwork may takes as many as 4 weeks. Without building dryers, you are totally dependent on the weather and the drying time can take several weeks, resulting in significant delays in your building project.

 

Why dry plasterwork with building dryers?

Building dryers ensure that your walls are dry in no time! At buildingdryers.be, plasterwork is in principle dried with condensation building dryers, because these are very efficient from 7°C. Moreover, they ensure nice drying, preventing cracking due to too fast drying.

Drying plasterwork with fans and additional heating

The building dryers are combined with fans so that the dry air is perfectly distributed across the plasterwork. In this way, nice uniform drying is obtained. Additional heating is only used if the room temperature is too low and the drying time of the stucco becomes critical. The ideal drying temperature is 20 to 25°C, at temperatures less than 20°C, additional heating can provide a solution. 

The ideal drying temperature is 20 to 25°C.

At room temperatures less than 7°C, extra electrical heating is mandatory. At low temperatures, the building moisture does not evaporate fast enough, whereby less water is released from the plasterwork; However, as soon as we raise the room temperature, the building moisture will evaporate faster because more water is released. You could compare it with a bucket of ice and a bowl of boiling water: at very low temperatures, like ice, there will be no evaporation at all, whilst at high temperatures, like boiling water, the moisture will evaporate much more quickly. Drying plasterwork in the winter is often done with additional heating, because warm air can take more moisture than cold air.

Drying plasterwork in the winter is often done with additional heating.

Drying plasterwork with Building Dryer

At Building Dryer you can hire not only building dryers, but also fans and electric heaters. These products can be hired both separately or combined. Do you need one of these products or a combination of them for your building project? Contact us at 0476/20.41.56 or use the contact form. We will be happy to send you a no commitment quote. Would you like to receive a detailed quote and are you in possession of a digital plan of your home? Then email it to Ruben@bouwdroger.com.

References
{{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }}
Total professionals! Quick and focused service combined with great customer friendliness and a professional attitude have been of great benefit to us. Keep up the good work!

Gert V.
{{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }}
Contacted one Sunday evening at 9pm, answered immediately. On a Sunday evening! The next morning the construction dryer could be delivered. Good material, everything is provided and professional installation. An example!

Gregory M.
{{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }}
Thank you for your prompt service! Truly a pleasure to work with you guys for our project. Top!

Hans D.
{{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }}
The two DF200s were with us for one month. The result is definitely very positive! We should have done this much ea

Björn C.
{{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }}
Thank you for your punctual and correct service!

Steven A.
{{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }}
Thank you very much for the punctual delivery of the construction dryer and the friendly and clear explanation by Jelle.

Patricia V.
{{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }}
Good service and very friendly people. Appointments made are kept perfectly. In short: highly recommended.

David V.
{{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }}
Very good service!

Ward L.
{{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }}
The building dryer did its job well and we are very satisfied with the service!

Bart C.
{{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }} {{ imagesalt }}
Very wide selection always the right advice for which devices to use. And on top of that friendly, helpful staff and all at very competitive prices. Highly recommended!

Branco B.
Projects

TEMPORARY HEATING AT THE NEW BELORTA SITE
When it came time to take care of the interior finishing of the offices, the contractor turned to ou
Read more >

See our realisations
{{ imagesalt }}
{{ imagesalt }}
{{ imagesalt }}
{{ imagesalt }}
{{ imagesalt }}
Discover our tips

Painting after drying
The plastering phase of your project is almost completed. Now is the time for efficient drying of the plasterwork. One address: Buildingdryers.be!
Read more >

Discover all our tips
Discover our tips

Practical tips
With natural drying it is difficult to estimate the length of the drying process, but also with building dryers it is virtually impossible to determine the exact drying time. In general.
Read more >

Discover all our tips
Discover our tips

Laying parquet
Your building project is finally coming to an end. Are you planning to install parquet flooring? Then make sure that the screed has fully dried out.
Read more >

Discover all our tips
Discover our tips

Hiring measuring equipment
Also when using building dryers, it not always excactly clear how long the drying process will take. To know just how dry your wall or screed already is, you can use specialised measuring equipment.
Read more >

Discover all our tips
Discover our tips

Building dryer and fan
Hiring a building dryer is interesting for those who want to finish their home. It will save you time and also the stress that is associated with lack of time.
Read more >

Discover all our tips