Location
Heusden Zolder
Type of work performed
This beautiful villa in Heusden was recently given fresh plasterwork and a new screed was poured. Since the owners want to move in as soon as possible, they turned to bouwdroger.com
After all, the carpenter cannot start installing the kitchen and inside doors until the plaster is good and dry. And the screed can only have 2% residual moisture for the hardwood floors to be installed.
Because of the large volume of this house, they opted to use two DF600 industrial dehumidifiers in combination with four powerful TTV4500 fans. The industrial dehumidifiers get the air nice and dry. The fans help to distribute the dry air throughout the home, at the same time as helping ensure even drying, thanks to this extra air movement.
After a drying time of four weeks, we got this villa perfectly dry so that the carpenter and floor layers could get on with the job.
Warehouse address
Briel 17
9200 Baasrode
Company seat
Houtenmolenstraat 69B
B-9255 Buggenhout